The US military says it plans to move forward with the detonation of several tons of unstable explosives at an Iowa munitions factory on or by Tuesday, according to a new court filing. It will do so despite a federal court order that indefinitely suspended detonation plans, a decision the military has said it does not need to follow because of the public safety risks associated with the possibility of the explosives detonating on their own.
In federal court records filed Saturday evening, the Department of the Army said it plans to use an emergency exclusion for munitions and explosives to the Environmental Protection Agency permit. The government says it must carry out a controlled detonation to protect the public from the greater threat posed by an uncontrolled explosion.
Friday, a federal court suspended the US Army’s project to detonate explosives containing lead azide at a munitions factory in Middletown, Iowa, after community outcry over the risk of toxic lead particles spreading in a dust plume in parts of Iowa and Illinois.
The military had initially planned two controlled explosions on Friday. The army then delayed their appearance until Monday before the court intervened.
The 8th U.S. Circuit Court of Appeals granted an emergency motion to stay the demolition after environmental groups filed a lawsuit.
The military said Friday it was working closely with the Department of Health and Human Services and the EPA to ensure the controlled explosion would take place as safely as possible.
“Officials have meticulously planned for this event since March, and all agencies involved are prepared to take the most extreme mitigation measures available to ensure there is no risk to the public and any disruption is minimized,” the statement said.
In its filing on Saturday, the government warned that it had to carry out the controlled explosion by Tuesday as the temperature was expected to drop below 30 degrees in the coming days. It says the lead azide has deteriorated and crystals in the waste could break as temperatures drop.
“A controlled detonation allows the Army to implement measures to minimize the risk to the public, including the risk related to the ejection of partial unexploded ordnance that may later detonate from the installation,” the court filing states. “The Army intends to act in accordance with the terms of the emergency permit and its mitigation measures, even if they are not in effect. This includes mitigation measures to minimize the risk of dispersal of lead dust. In short, a controlled detonation is far safer than an uncontrolled explosion.”
In response to the military’s request, the Iowa Environmental Council and the Sierra Club filed a motion Sunday to supplement their emergency request to block the planned detonation.
The filing includes three statements from experts and local governments challenging the military’s assessment of the risk of delaying the detonation, as well as concerns about public notice and potential health and environmental impacts.
In March this year, the military said it had discovered that 68 drums of lead azide at the site had begun to “re-crystallize.” The lead was stored in bunkers at the Iowa Army Ammunition Plant, a munitions factory built in 1941 that produces quality medium- and large-caliber ammunition.
Gn usa

