I-285 bridge over Chattahoochee reopens after span closed for temporary repairs – WSB-TV Channel 2

Temporary repairs are completed on a major interstate bridge after an emergency closure caused traffic problems in metro Atlanta on Saturday.

(SIGN UP: WSB-TV Daily Newsletter)

The southbound Interstate 285 bridge over the Chattahoochee River was closed early because an emergency inspection detected a defect.

The Georgia Department of Transportation said contractors were making temporary repairs to a bridge deck joint around 8:45 p.m. All lanes were open as of 10 p.m.

A Channel 2 reporter will have updates on WSB Tonight. Watch for additional updates at WSBTV.com.

“While there is no structural hazard to the bridge, the issue could impact motorists’ ride quality,” GDOT said in a news release.

A motorist said Channel 2 Action News she was stuck in traffic for about three hours. Some motorists were parked on the highway.

“We were all just trying to understand what was going on and pass information on to each other,” Alexia Gueguen said.

GDOT reported on GDOT 511GA before 6 p.m. that the Chattahoochee River Bridge at Interstate 285 South was completely closed after an emergency inspection.

TRENDING STORIES:

Contractors are expected to begin long-term repairs to the bridge in early December.

The Chattahoochee Bridge on Interstate 285 North was not affected by the closure, GDOT says.

(DOWNLOAD: Free WSB-TV News app for breaking news alerts)

Gn bussni

Logo